Construction Scheduler
Company: MGE Underground, Inc.
Location: Chico
Posted on: February 13, 2026
|
|
|
Job Description:
Job Description Job Description About MGE MGE Underground is a
growing utility infrastructure contractor serving utility companies
from our Paso Robles headquarters and regional hubs throughout
California. Our mission is to support our clients’ expanding
utility and infrastructure requirements by positioning MGE as the
leading provider of innovative construction solutions at the best
value. Our Core Values Safety | Continuous Development | Respect |
Integrity | Performance | Trust | Fun How You Can Make an Impact
The Construction Scheduler is responsible for developing,
analyzing, and managing project and program schedules to ensure
timely and cost-effective project completion. This position
centralizes and standardizes our project scheduling function. This
role is dedicated to increasing visibility in projects, improving
resource allocation, and providing crucial data for strategic
decision-making (i.e., equipment procurement and scheduling). How
You Will Contribute Create, update, and maintain comprehensive,
resource-loaded project schedules from initiation to closeout using
MS Project. Define and monitor the project's critical path to
identify and report on potential risks, delays, and opportunities
for acceleration. Working closely with Program Managers/Sr.
Managers. Collaborate directly with project managers,
superintendents, and Fleet Managers to gather accurate progress
data and update schedules accordingly. Develop and maintain
dashboards and reports using MS Project (and potentially Monday.com
/ Excel Click formats) to communicate look-ahead schedules, project
status, and key performance indicators to stakeholders. Analyze
project schedules to forecast and level resource requirements
(labor, equipment, materials), identifying potential constraints
and bottlenecks. Conduct "what-if" analyses to assess the schedule
impact of proposed changes and provide data-backed recommendations
to the project team. Occasionally travel to job sites as needed.
Perform other duties as assigned. What You Bring to the Table A
thorough understanding of construction sequencing, CPM (Critical
Path Method) logic, and resource management principles. Experience
with collaboration platforms like Monday.com. High level of
analytical thinking, proactive problem-solving, clear
communication, exceptional attention to detail, and strong
collaboration skills. Advanced proficiency in Microsoft Excel
(pivot tables, complex formulas, charting, etc.). Proficient in
Microsoft Office Suite, including Word, Excel, Outlook, and
PowerPoint. High School Diploma or GED Valid Class C Driver’s
License; clean driving record and no driving restrictions Your
Prior Experience Minimum 3 years in project management, project
scheduling, or project controls. Preferred: Bachelor’s degree in
Construction Management, Engineering, or a related field. Our
Competitive Package Pay: $82,000 -$92,000 annually This pay range
is our competitive compensation at the time of this job posting.
Your pay will be determined based on experience, education, skills,
and applicable knowledge. Above and Beyond Benefits Medical,
dental, vision, and life insurance. 401K We offer a flex-time
vacation policy for exempt employees in addition to ten paid
company holidays. Multiple monitors, standing desks, and other
ergonomic equipment to match your work style. Monthly birthday
celebrations, team lunches, company-wide employee recognition
events, and other employee engagement opportunities.
Employer-sponsored learning/career development opportunities and
conferences/seminars. Employee Assistance Program: no-cost
counseling, legal consultation, financial consultation, ID
recovery, emotional well-being resources, dependent care resources,
and crisis consultation. Additional Information Job Type:
Full-Time, On-Site Affirmative Action/EEO MGE Underground is an
equal opportunity employer and does not discriminate based on any
protected characteristics. Pre-Employment and Physical Requirements
Successful applicants must pass a drug screen and background check
before beginning employment. *This role may require: Prolonged
periods of sitting while working at a computer or desk. Must be
able to occasionally lift and carry items weighing up to 25 pounds
or up to 50 pounds with assistance. Often required to stand and
walk for prolonged periods of time. Must have physical strength,
balance, hand-eye coordination, and excellent stamina necessary to
complete jobs in various areas. Specific vision abilities required
by this job include close vision, distance vision, color vision,
peripheral vision, depth perception, and the ability to adjust
focus. Must be able to access and navigate job sites and
construction areas. Must be able to work in all weather conditions.
*Reasonable accommodation may be made to enable individuals with
disabilities to perform these essential functions. Other Duties
Your duties and responsibilities may change at any time, with or
without notice, based on the company’s needs. Powered by JazzHR
KsSRrZQhqW
Keywords: MGE Underground, Inc., Arden-Arcade , Construction Scheduler, Construction , Chico, California